Back to the backflow review queue

Backflow assembly test: 573 Orchard Way

Approved

Filed May 21, 2026 by Morgan Calloway, Heritage Plumbing & Backflow. Filed from a phone.

Report

Date of service
May 21, 2026
Assembly type
DC
Serial number
A183504
Size
1
Test gauge serial
G-3176
Gauge calibration date
Feb 5, 2026
Check valve 1
8.7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Calloway, current on the service date
  • All required fields present
  • Address matches parcel 077-81-01222
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

573 Orchard Way
Owner: Hayden Stroud
Parcel 077-81-01222