Back to the backflow review queue

Backflow assembly test: 2995 Ridgeview Ct

Approved

Filed Jun 6, 2026 by Alex Fairley, Heritage Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Jun 6, 2026
Assembly type
PVB
Serial number
K925399
Size
1
Test gauge serial
G-2668
Gauge calibration date
Oct 8, 2025
Check valve 1
6.8 psid
Check valve 1 closed tight
Yes
Check valve 2
2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Alex Fairley, current on the service date
  • All required fields present
  • Address matches parcel 077-50-01119
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2995 Ridgeview Ct
Owner: Taylor Ellery
Parcel 077-50-01119