Back to the backflow review queue
Backflow assembly test: 2352 Pine Knoll Trl
ApprovedFiled Aug 27, 2026 by Cameron Lindqvist, Northstar Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Aug 27, 2026
- Assembly type
- PVB
- Serial number
- Z707857
- Size
- 1
- Test gauge serial
- G-9248
- Gauge calibration date
- Apr 4, 2026
- Check valve 1
- 4.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Cameron Lindqvist, current on the service date
- All required fields present
- Address matches parcel 079-43-01331
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
2352 Pine Knoll Trl
Owner: Casey Brandt
Parcel 079-43-01331