Back to the backflow review queue

Backflow assembly test: 6301 Stone Gate Ln

Approved

Filed May 14, 2024 by Parker Okafor, Summit Backflow Testing. Filed from a phone.

Report

Date of service
May 14, 2024
Assembly type
PVB
Serial number
A647523
Size
3/4
Test gauge serial
G-9285
Gauge calibration date
Feb 12, 2024
Check valve 1
7.7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Okafor, current on the service date
  • All required fields present
  • Address matches parcel 079-93-01051
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

6301 Stone Gate Ln
Owner: Cameron Stroud
Parcel 079-93-01051