Back to the backflow review queue

Backflow assembly test: Golden Car Wash

Approved

Filed Nov 23, 2024 by Cameron Lindqvist, Northstar Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 23, 2024
Assembly type
RP
Serial number
K819634
Size
4
Test gauge serial
G-8916
Gauge calibration date
Aug 7, 2024
Check valve 1
7.5 psid
Check valve 1 closed tight
Yes
Check valve 2
1.3 psid
Relief valve opened at
1.2 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Lindqvist, current on the service date
  • All required fields present
  • Address matches parcel 079-53-01196
  • RP relief valve must open at 2.0 psid or more.
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5346 Stone Gate Dr
Owner: Pruitt Holdings LLC
Parcel 079-53-01196