Back to the backflow review queue

Backflow assembly test: Corner Market

Approved

Filed May 6, 2025 by Logan Danner, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
May 6, 2025
Assembly type
RP
Serial number
B848798
Size
2
Test gauge serial
G-1154
Gauge calibration date
Mar 17, 2025
Check valve 1
5.1 psid
Check valve 1 closed tight
Yes
Check valve 2
1.1 psid
Relief valve opened at
4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Logan Danner, current on the service date
  • All required fields present
  • Address matches parcel 085-48-01140
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9430 Orchard Ct
Owner: Fairley Holdings LLC
Parcel 085-48-01140