Back to the backflow review queue

Backflow assembly test: Main Street Medical Offices

Sent back

Filed Nov 19, 2026 by Cameron Nguyen, Clearwater Backflow Testing. Filed from a phone.

Report

Date of service
Nov 19, 2026
Assembly type
DC
Serial number
K732835
Size
1 1/2
Test gauge serial
G-7708
Gauge calibration date
Feb 15, 2026
Check valve 1
5.2 psid
Check valve 1 closed tight
Yes
Check valve 2
2.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 085-39-01271
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Sent back Please add the test gauge calibration certificate.

Property

4739 Spring Branch Dr
Owner: Nguyen Holdings LLC
Parcel 085-39-01271