Back to the backflow review queue

Backflow assembly test: 7288 Stone Gate Way

Approved

Filed Nov 7, 2024 by Hayden Whitcomb, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Nov 7, 2024
Assembly type
PVB
Serial number
B194609
Size
1
Test gauge serial
G-2308
Gauge calibration date
Feb 2, 2024
Check valve 1
8.2 psid
Check valve 1 closed tight
Yes
Check valve 2
1.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Whitcomb, current on the service date
  • All required fields present
  • Address matches parcel 085-49-01222
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

7288 Stone Gate Way
Owner: Logan Benton
Parcel 085-49-01222