Back to the backflow review queue

Backflow assembly test: 9498 Mill Creek Trl

Approved

Filed Nov 26, 2025 by Cameron Nguyen, Clearwater Backflow Testing. Filed from a phone.

Report

Date of service
Nov 26, 2025
Assembly type
RP
Serial number
K625274
Size
3/4
Test gauge serial
G-3257
Gauge calibration date
Nov 12, 2024
Check valve 1
3.7 psid
Check valve 1 closed tight
Yes
Check valve 2
1 psid
Relief valve opened at
1.4 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 085-40-01037
  • RP relief valve must open at 2.0 psid or more.
  • Test gauge calibration is more than a year old.
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

9498 Mill Creek Trl
Owner: Drew Harlow
Parcel 085-40-01037