Back to the septic review queue

Septic maintenance (pump-out): 5557 Spring Branch Trl

Approved

Filed Dec 28, 2025 by Parker Marsh, Clearwater Wastewater. Filed from a phone.

Report

Date of service
Dec 28, 2025
Tank size
1000 gal
Compartments
1
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
925 gal
Sludge depth
27 in
Scum depth
5 in
Baffles in good condition
No
Effluent filter
None present
Lids and risers secure
Yes
Distribution box level, clear and undamaged
No
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
Yes
Repair needed: describe
Cracked lid
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Marsh, current on the service date
  • All required fields present
  • Address matches parcel 087-18-01034
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Distribution box reported uneven, blocked or damaged.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

5557 Spring Branch Trl
Owner: Alex Calloway
Parcel 087-18-01034