Back to the backflow review queue

Backflow assembly test: 1823 Mill Creek Trl

Approved

Filed May 8, 2026 by Sam Danner, Summit Backflow Testing. Filed from a phone.

Report

Date of service
May 8, 2026
Assembly type
RP
Serial number
B660222
Size
3/4
Test gauge serial
G-2379
Gauge calibration date
Apr 2, 2026
Check valve 1
0.3 psid
Check valve 1 closed tight
No
Check valve 2
1.9 psid
Relief valve opened at
3.1 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Sam Danner, current on the service date
  • All required fields present
  • Address matches parcel 093-32-01214
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1823 Mill Creek Trl
Owner: Jordan Danner
Parcel 093-32-01214