Back to the backflow review queue

Backflow assembly test: 2090 Sycamore Dr

Approved

Filed Apr 19, 2026 by Sam Benton, Summit Backflow Testing. Filed from a phone.

Report

Date of service
Apr 19, 2026
Assembly type
RP
Serial number
K492996
Size
1
Test gauge serial
G-7562
Gauge calibration date
Aug 24, 2025
Check valve 1
3.8 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Relief valve opened at
2.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Sam Benton, current on the service date
  • All required fields present
  • Address matches parcel 093-16-01213
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

2090 Sycamore Dr
Owner: Hayden Marsh
Parcel 093-16-01213