Back to the backflow review queue

Backflow assembly test: 7136 Cedar Hollow Trl

Approved

Filed Jun 5, 2026 by Quinn Ashby, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 5, 2026
Assembly type
PVB
Serial number
Z567150
Size
3/4
Test gauge serial
G-1316
Gauge calibration date
Sep 22, 2025
Check valve 1
5.4 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Ashby, current on the service date
  • All required fields present
  • Address matches parcel 095-79-01354
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

7136 Cedar Hollow Trl
Owner: Alex Wexler
Parcel 095-79-01354