Back to the backflow review queue

Backflow assembly test: 781 Stone Gate Ln

Approved

Filed Aug 2, 2025 by Quinn Ashby, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Aug 2, 2025
Assembly type
DC
Serial number
A367980
Size
1
Test gauge serial
G-8752
Gauge calibration date
Dec 4, 2024
Check valve 1
7.6 psid
Check valve 1 closed tight
Yes
Check valve 2
1.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Ashby, current on the service date
  • All required fields present
  • Address matches parcel 095-87-01064
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

781 Stone Gate Ln
Owner: Hayden Hollins
Parcel 095-87-01064