Back to the backflow review queue

Backflow assembly test: Golden Medical Offices

Approved

Filed Jun 11, 2025 by Morgan Benton, Keystone Backflow Testing. Filed from a phone.

Report

Date of service
Jun 11, 2025
Assembly type
DC
Serial number
K105063
Size
4
Test gauge serial
G-8870
Gauge calibration date
Sep 24, 2024
Check valve 1
5.6 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Benton, current on the service date
  • All required fields present
  • Address matches parcel 095-48-01106
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5906 Sycamore Dr
Owner: Ashby Holdings LLC
Parcel 095-48-01106