Back to the backflow review queue
Backflow assembly test: 4133 Orchard Ln
ApprovedFiled Jul 7, 2026 by Parker Fairley, Patriot Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jul 7, 2026
- Assembly type
- DC
- Serial number
- K769215
- Size
- 1
- Test gauge serial
- G-9402
- Gauge calibration date
- Oct 31, 2025
- Check valve 1
- 7.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Fairley, current on the service date
- All required fields present
- Address matches parcel 107-92-01054
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
4133 Orchard Ln
Owner: Cameron Ellery
Parcel 107-92-01054